from the drawings to the production

“Luca,

the Pacific project is proceeding wonderfully. Everyone is very impressed with your team's work. Architects, GC and masons cannot believe how well it is all going together.”

(Jim Spahr – American Soil – Pacific Diamond Sky Project – San Francisco)

 

“Thank you Luca, we appreciate your attention to details with an expert eye!”

(Christeen Sawires – MarmiStone – 750CBR Project – Washington DC)

“Thank you Luca for this valuable feedback!

We are currently studying and discussing your suggestions with the client and will consider it on the final version of the shop drawings.”

(Christeen Sawires – MarmiStone – 750CBR Project – Washington DC)

 

“Hi Luca,

I hope you are well. We have completed the installation of the front entry and everything is looking really great.”

(Stephen Mann – MarmiStone – 750CBR Project – Washington DC)

overall technical management

The use of stone materials in the building project, in its complexity, is divided into several stages. The high cost of the raw material and its processing requires careful study and careful design to reduce waste to the maximum.

Below is a brief and concise description of the general operational lines of the use of stone materials in the building project.

These services can be offered in the totality, or only in the part that at that time need to the company.

preliminary

In the initial phase, the study of the material, the selection criteria according to the intended use and the physical mechanical characteristics is essential for a successful outcome of the project. At this stage it is also important to write a BoQ (Bill of Quantity), that is, a detailed list of what you will have to produce on which you will base, then, the development of the project, from the estimate to the drafting of the production program.

This is the phase in which the foundations of the project are laid, where the experience in its preparation can make a difference in the realization. If BoQ, planning, technical analysis of the project and material research are carefully prepared, the realization will then be very fluent

engineering

the next stage is project engineering. At this stage, already begun in its preliminary with the drafting of the BoQ, in accordance with the customer’s requests and the architect’s project all the executive drawings necessary for production are made. Once verified and approved will be produced the bills of work necessary to the various laboratories to perform the work.

production

the most delicate phase when you get to the heart of the project. The choice and purchase of materials, the choice of laboratories, according to their production capabilities and skills, the organization of the production process according to planning, product control, both in the preliminary stage and during processing, the dry-lay for the final verification, and finally the packaging.

logistics

Handling, at every stage, is always a delicate operation. From the procurement of materials to the various movements and the final delivery of the goods. Organizing everything with logic and rationality means reducing time and costs. Ensuring that the material necessary for the progress of the project is always present where it is needed, whether it is the laboratory or the construction site, is essential for the success of a project.

Study the project and possible solutions to try to anticipate the possible problems, prepare the executives for the laboratory and finally organize and control the production.

This is what determines the success of a project.

 750 cbr - private residence - washington

Pre Construction

Production

Installation